News Article
| << Back |
| KBR Awarded FEED Contract by Chevron for Big Foot Topsides Project |
The goal is to develop Big Foot with a dry-tree floating drilling and
production facility. The hull would be an extended tension leg platform
(ETLP), and the topside oil and gas processing facilities would include
inlet separation, gas compression, dehydration and export, oil treatment
and export pumping, produced water treatment, and required utility
systems. Water injection facilities would be provided with the initial
facility installation to enable reservoir pressure maintenance early in
the life of the field. KBR will provide engineering and project
management services to develop the process design; specify the required
equipment; layout, modularize and integrate the decks; perform the
necessary structural analyses; and provide the electrical power
generation and distribution system designed to support the platform and
the downhole electrical submersible pump requirements. KBR will also
assist
“We are proud to have been selected as the contractor of choice by
KBR is a global engineering, construction and services company supporting the energy, hydrocarbon, government services, minerals, civil infrastructure, power and industrial markets. For more information, visit www.kbr.com.
Source: KBR
KBR |




